Equipment we are set up for.
The sectors and equipment types our crews are equipped to handle.
Where we work
Nine kinds of equipment, nine different problems
Rigging is not one skill applied to different boxes. What makes a brewery tank difficult has almost nothing in common with what makes a switchgear lineup difficult, and a crew that does not know the difference finds out on your floor.
Below is the equipment CWS is set up for, and the thing that usually goes wrong with each. Read the one that matches yours. If it is not listed, call (303) 284-6845 and describe it; we will tell you straight whether it is work we should be doing.
Industries and equipment types
Brewery and food-grade equipment
Tanks, kettles, fillers, conveyors and packaging lines.
Brite tanks and fermenters are light for their size and tall for their footprint, so the centre of gravity sits high and the shell dents if you look at it wrong. Most brewery work is also done in a live building through a door that was sized for kegs, not for a 30 barrel vessel.
Industrial manufacturing
Presses, production lines, mills, lathes and material handling.
The weight is rarely the problem. The problem is the sequence: what comes out first, what the floor will carry, and how long the line can be down. A press that takes four hours to move can take two days to put back into tolerance if it is set on an uneven slab.
Aerospace
Tooling, fixtures, autoclaves and test equipment.
Aerospace work tends to come with documentation requirements that outlast the move itself, and with tooling whose value has nothing to do with its weight. A fixture worth more than the truck carrying it needs a plan that treats it that way.
Clean rooms
Equipment going into, or coming out of, a controlled environment.
Everything changes at the door. Wrapping, wipe-down, which wheels are allowed past the gown room, and whether the lift equipment itself can enter at all. Plan the contamination control before the rigging, not after.
Electrical systems, switchgear and transformers
Switchgear lineups, panels, bus duct and distribution gear.
Switchgear lineups are long, narrow and intolerant of racking. Lift from the wrong points and you twist the frame; the doors stop closing and the bus alignment goes out. Sections also have to land in order, because you cannot slide section four in once three and five are bolted down.
Substation transformers
Pad and substation transformers, with the weight to match.
Dense, top-heavy and expensive to tip. Transport is usually the harder half of the job: axle weights, route survey, bridge ratings and an oversize permit before anything leaves. Impact recorders are standard on units of any value, and they are read on arrival.
HVAC: chillers, boilers and CRAH units
Rooftop and mechanical-room equipment, swapped or installed.
Access is the whole job. A chiller going to a roof is a crane pick and a street closure; the same chiller going to a basement mechanical room is a week of rigging through a stairwell. CRAH units add a live data floor to the problem, which means no dust and no downtime.
CNC machinery
Mills, lathes, machining centres and their peripherals.
Machining centres are the clearest case of a move only being as good as the set. The machine arrives fine and then has to be levelled, usually in stages over a day or more as the casting settles, before it will hold tolerance again. Rush that part and the move was wasted.
Medical equipment including MRI and CT scanners
Imaging equipment in and out of live clinical buildings.
An MRI magnet is heavy, extremely sensitive to shock, and surrounded by a building that was finished around it. Many installs need a wall opened. The constraint that catches people out is the one around the magnet rather than the magnet itself: no ferrous material near the bore, and a route that keeps it that way.
One thing every job on this list shares
The equipment is almost never the constraint. The building is. Door widths, floor ratings, turning radius at the dock, the pipe run nobody drew on the plan. Send photographs of the access at both ends with your weights and dimensions and you will get a far better answer than you will from the spec sheet alone.
See what we own and what it lifts, how storage and warehousing fills the gap when a site is not ready, or send the details for a project quote.